    I'm modeling the Boston & Maine's Eastern Route in HO standard gauge in my 207-year-old house's attic. The attic has its pluses and minuses - plenty of space, just up the stairs and finished, but the combination of the sloping ceiling and a 36" minimum radius meant I could only do an around-the-walls plan. Also, it can get a bit hot in the summer and cold in the winter.

    The layout incorporates my Rowley MA modules, presently the only finished scenery, in the rural northern half of the attic. The southeast corner is where I'm building my compressed version of West Lynn, MA including the General Electric River works and the West Lynn creamery.



    This photo shows the mainline curve passing the future creamery (spur under the file) and the Saugus Branch (long staging tracks) coming in from the left. I'm spiking rail on the branch, building the switch comes next. The flying plywood is actually pretty rigid with the flange below and the backdrop partially installed, it will get better when I bring the backdrop around to the left edge of the photo.
    James


  • #2
    Looks real good to me. I'd like to see a few more photos. Do you make your own ties? What are you gluing them down with?
    Bill Shanaman

    New Haven RR

    Hartford Division

    in Colorado.

    Comment


    • #3
      I posted a few pictures of this project to "Subroadbed, Roadbed and Track" over in the Model Railroad Construction forum, and the Rowley modules are on my site: http://www.faracresfarm.com/jbvb/rr/gallery/index.html The southwest corner has a bunch of structures, but they aren't in finished scenery yet. I'll post a panoramic shot or two over the weekend.

      Ties in this area are a mix of Campbell Profile, home-made and Mt. Albert Scale Lumber, glued to homasote with yellow carpenter's glue. I use the tie jig/tape process, but usually hand-place switch ties.

      [Edit Long Afterward]

      Borrowing an idea from John Siekirk, I made up a short index to this thread and am pasting it into my otherwise prosaic second post:

      RR-Line B&M Eastern Route Progress index (page #, date or range, highlights of activity):

      3. 2008-2009 Operation through West Lynn via shoo-fly to old test loop. Railroad St. in Bexley, carved Tunnel portal.
      .... 2008-12 MRC Prodigy throttle control bus thread: https://railroad-line.com/node/13176
      .... 2009-02 N. E. Farmhouse (Creative Laser Design) thread: https://railroad-line.com/node/13678
      4. 2009-06 Bexley scenery & structures, benchwork & track for Newbury
      5. 2009-2010 Remove test loop, benchwork & track for Draw staging, Newburyport West
      .... 2010-04 Merrimack St. overpass thread: https://railroad-line.com/node/18188
      6. 2010-05 Draw staging switch machines, benchwork & track for Newburyport.
      7. 2010-07 Draw control panel
      8. 2010-07-29 Brass spike at Nbpt.
      9. 2010-10 Newburyport West panel, Newburyport area backdrop
      .... 2010-10 Guardhouse for the Gear Plant thread: https://railroad-line.com/node/19959
      10. 2010-11 First XTrkCAD track plan
      11. 2011-02 Newbury backdrop
      12. 2011-04 Little River bed, landforms
      14. 2011-05 High St., Winter St landforms, W.Lynn Backdrop complete, begin Clam Box.
      .... 2011-06 Before Galvanized Steel Highway Guardrails thread: https://railroad-line.com/node/22017
      .... 2011-09 Improvements to Con-Cor P-54 coach & MB-54 RPO/Baggage: https://railroad-line.com/node/22863
      .... 2011-10 Discuss LED light strips for layout lighting thread: https://railroad-line.com/node/22997/page2
      .... 2011-11 Start Gothic Arch Dairy Barn build thread: https://railroad-line.com/node/23315
      .... 2012-02 Clam Box construction photos on pg. 32-44: https://railroad-line.com/node/23918/page32
      .... 2012-04 Start Post-1850 New England Farmhouse thread: https://railroad-line.com/node/24774
      16. 2012-06 Clam Box finished, begin Rice Farm house
      17. 2012-09 Bexley Enginehouse area scenery, Robinson Rd. overpass.
      18. 2012-12 Start track for GE Receiving, finish West Lynn yard
      19. 2013-02 Little River bed, marsh grass, Four Rock bridge begun
      .... 2013-03 Start 'Detailing P1K RDC for B&M' thread: https://railroad-line.com/node/27801
      .... 2013-05 Start 'Prototypic Dwarf Signals' thread: https://railroad-line.com/node/28096
      21. 2013-06 Begin High St. overpass construction
      22. 2013-06 Finish High St. overpass, start EE AP documents, Hytron building.
      .... 2013-10 Preparing for timetable and card-order operations gets serious: https://railroad-line.com/node/29303
      25. 2013-11 Working on timetable
      27. 2013-12 Rice farm barn (Sylvan)
      28. 2014-01 Rowley rock cut complete, Rice farm fencing begun
      .... 2014-01 Building BCW ex-RDG passenger car kits: https://railroad-line.com/node/30004
      29. 2014-02 More photos of Rt. 1A for upcoming RMC article.
      30. 2014-02 Mike's house on its adjustable foundation, Hytron printed windows & sign
      .... MRC 16-bit sound decoder in Atlas RS-3: https://railroad-line.com/node/30272
      31. 2014-03 R.E. Walters built from RRKits EF-13.
      32. 2014-06 First pit at Bexley Enginehouse, first try at painting Newbury backdrop.
      34. 2014-08 Pouring Little River, 2nd Newbury backdrop painting.
      36. 2014-11 Finish Little River marsh grass.
      .... 2014-11 Start Upgrade GHQ Hay Wagon thread: https://railroad-line.com/node/31866
      38. 2015-02 Start Acme Fast Freight building.
      .... 2015-02 Start '3D Background Tenements' thread: https://railroad-line.com/node/32664
      38. 2015-03 Start Gorin Machine building.
      .... 2015-04 Start 'AMB Yard Office' thread: https://railroad-line.com/node/33013
      .... 2015-05 Start 'Lineside Signals' thread: https://railroad-line.com/node/33232
      41: 2015-06 Finish Acme Fast Freight, install Mieke's West Lynn yard office
      .... Mieke starts Bexley Depot build: https://railroad-line.com/node/33279
      42: 2015-06 East Bexley interlocking in service.
      43: 2015-08 Outdoor lighting in Rowley area; yard light build in: https://railroad-line.com/node/33262
      44: 2015-10 Signage in Rowley area
      45: 2015-11 Mieke begins cloth skirts for layout
      47: 2015-12 Bexley station site scenery begun.
      49: 2016-03 Signals operational from Bexley Tunnel to Newburyport Draw
      52: 2016-11 NE-5 caboose gets Tomar Adlake markers thread: https://railroad-line.com/node/35887
      53: 2017-01 Signals operational from Saugus Draw to Newburyport Draw (except for two bracket arms I need to scratchbuild)
      55: 2017-02 Boxed Pony Truss overpass thread: https://railroad-line.com/node/36245
      58: 2017-05 Construction of the Downtown Newburyport peninsula begins
      62: 2017-12 Downtown Newburyport roadbed complete
      65: 2018-02 Downtown Newburyport track complete
      .... 2018-04 5 Strong St. scratchbuild thread: https://railroad-line.com/node/37886
      71: 2019-09 6-4-6 sleeper Old Orchard Beach w/interior earns Merit
      74: 2019-12 Bexley Tower kitbash begins
      .... 2020-02 DynaCompuTron-A-Matics kitbash thread: https://railroad-line.com/node/39793
      .... 2020-02 28 Winter St scratchbuild thread: https://railroad-line.com/node/39817
      77: 2020-02 Bexley Depot stairs, railings, platform canopy lights
      79: 2020-04 Bexley Depot inter-track fence
      80: 2020-05 Midland video camera on simple drop-center camera car.
      82: 2020-12 Seashore Trolley Museum track work photos
      84: 2021-01 Work on Franklin St. in Bexley, webcam remote viewing experiments
      .... 2021-02 PRR FM flatcar scratchbuild thread: https://railroad-line.com/node/40780
      .... 2021-04 Kanthima's Scratchbuilt Structures thread: https://railroad-line.com/node/40926
      .... 2021-10 Maintaining Twin-Coil switch motors & Eshleman Turnout Links: https://railroad-line.com/node/969230
      .... 2022-01 Optical Occupancy Detectors thread: https://railroad-line.com/node/981221
      Last edited by jbvb; 01-17-2022, 10:55 PM.
      James

      Comment


      • #4
        Tonight I ran the first train onto the West Lynn section. But before I it got far, I had to recharge the Train Engineer's batteries. Still...



        Because I had the photofloods out, I also shot the area around the Bexley engine terminal (just east of the Bexley Tunnel, which substitutes for Salem and its Salem Tunnel, which I hadn't room to model).



        Looking timetable East, the body of the yard disappears in amongst the house's frame timbers.



        Timetable West, towards the tunnel. The structures are commercial kits, minimally customized. Turntable and ash host are Walthers. Yard office is the BEST Salisbury Point Station kit. Visible track is handlaid code 83.
        James

        Comment


        • #5
          James, you're making good progress on your layout too. I need to get my butt in gear and finish the basement so I can play too.
          Follow along as my dog and I travel the country in our van.
          FaceBook link: https://www.facebook.com/A-Dog-A-Van-and-A-View-108345371976229

          Comment


          • #6
            James,

            It looks like you have a great layout there and great progress to date. Looking forward to seeing further progress on your empire.
            Ron Newby

            General Manager

            Clearwater Valley Railway Co.

            http://cvry.ca

            Comment


            • #7
              Nice progress, James! Great to see another B&M'er on the forum. Love those buggies! :up: :up:
              Mike Hamer

              Ottawa, Ontario, Canada

              http://www.bostonandmaine.blogspot.ca

              http://www.craftsmanstructures.blogspot.ca

              http://modelrailroadsivisit.blogspot.ca

              Comment


              • #8
                Buggies are brass from Overland (wood 104600 series) and Alco (steel NE-5 type), my paint, thanks.
                James

                Comment


                • #9
                  Looks pretty good Jim!
                  _________________________________

                  Ian MacMillan

                  Wakefield, NH



                  Conrail\'s Amoskeag Northern in N Scale

                  www.amoskeagnorthern.com

                  Comment


                  • #10
                    James,

                    I'm just getting caught up with this thread. Your modules are terrific. You did a great job of creating the look and feel of rural farm country. It makes a nice setting for photographs of your rolling stock.

                    It'll be interesting to watch your progress on the layout.

                    George
                    Flying is the 2nd greatest thrill known to man. Landing is the first.

                    Comment


                    • #11


                      There are about 2000 new ties in this picture, maybe 1/8 cut down from Mt. Albert's 16 footers. I'm looking at the wood in the kindling bucket and thinking I prefer the Campbell Profile Tie approach, where theirs are over 20 scale feet long, so both sides of most cuts are usable. I'm using .0125" Homa-Bed to raise the main and middle siding above the running tracks and GE plant, and it's a joy to work with. Next time I might buy his shims rather than sanding my own.
                      James

                      Comment


                      • #12
                        The Hub Division Modular Group's container got packed Saturday, and I don't see my Rowley modules until April 14 (setup for Intermodellbau in Dortmund). So Sunday I finally got back to West Lynn. I had gotten the ties above stained and ballasted, and now I've spiked enough rail so I need another couple thousand MicroEngineering spikes. Won't be worth a photo until I get into the switches for the Middle track, though.
                        James

                        Comment


                        • #13
                          Looks like you are making good progress.. :up:

                          Comment


                          • #14
                            Nice work James, keep the photos coming!!

                            Comment


                            • #15


                              I've finished a couple of switches and the first train has run as far as the West Lynn "middle" track switches. Another couple packs of joiners, spikes and a bundle of rail are on the way (via the LHS, not internettrains.com, thanks).
                              James