Railroad Line Forums - Projects in Progress on the Southern Central RR
Railroad Line Forums
Username:
Password:
Save Password


Register
Forgot Password?
  Home   Forums   Events Calendar   Sponsors   Support the RRLine   Guestbook   FAQ     Register
Active Topics | Active Polls | Resources | Members | Online Users | Live Chat | Avatar Legend | Search | Statistics
Photo Album | File Lister | File Library
[ Active Members: 4 | Anonymous Members: 0 | Guests: 75 ]  [ Total: 79 ]  [ Newest Member: tx28 ]
 All Forums
 Model Railroad Forums
 Early Rail Forum
 Projects in Progress on the Southern Central RR
Previous Page | Next Page
 New Topic |   Reply to Topic | 
Author Previous Topic: Promised Update... Topic Next Topic: Max Engine Miles per Hour
Page: of 89

Michael Hohn
Fireman



Posted - 10/06/2019 :  9:06:27 PM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
quote:
Originally posted by Guff

Mike,
It's fun to see your layout grow and develop. You're creating a fine time period replica!


Thank you, David, itís fun reading your comment. I much appreciate it.

Mike



Country: USA | Posts: 5571 Go to Top of Page

Pennman
Fireman

Premium Member


Posted - 10/07/2019 :  05:48:34 AM  Show Profile  Reply with Quote
Mike,

Getting back in touch with your progress, it seems that you are enjoying your time designing and building, making it work, etc. AND, I am enjoying watching. Looks good.

Rich



Country: USA | Posts: 4227 Go to Top of Page

Michael Hohn
Fireman



Posted - 10/07/2019 :  10:44:57 AM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
quote:
Originally posted by Pennman

Mike,

Getting back in touch with your progress, it seems that you are enjoying your time designing and building, making it work, etc. AND, I am enjoying watching. Looks good.

Rich


Thank you, Rich. Nice hearing from you.

Mike



Country: USA | Posts: 5571 Go to Top of Page

Michael Hohn
Fireman



Posted - 11/30/2019 :  9:42:09 PM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
The rural end of my layout continues to develop, although at a slow pace. Much of the work has involved pulling up track, but it hasn't been all destruction. To make curves in the wye more reasonable I detached the peninsula and moved it over to the right about 16". That also gave me more space behind the peninsula to maneuver. Track you see to extreme left represents points south, basically staging. Here is how it looks now, with some track mocked up:




Meanwhile, I have been working on a T-Trak module for my local NMRA division.

Mike


_______________________________________________________________________________________________
Nobody living can ever stop me, as I go walking that freedom highway -- Woody Guthrie

Country: USA | Posts: 5571 Go to Top of Page

Bill Gill
Fireman



Posted - 12/01/2019 :  09:04:24 AM  Show Profile  Reply with Quote
Shifting the peninsula looks like it helps a lot. The wye is looking good.


Country: USA | Posts: 2749 Go to Top of Page

Michael Hohn
Fireman



Posted - 12/01/2019 :  09:39:54 AM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
quote:
Originally posted by Bill Gill

Shifting the peninsula looks like it helps a lot. The wye is looking good.


Thank you, Bill.

I was reluctant at first about doing the shift but knew all along that it had to be done. The work didnít require much more than removing a few screws and two bolts.

Mike



Country: USA | Posts: 5571 Go to Top of Page

railman28
Fireman



Posted - 12/01/2019 :  1:48:25 PM  Show Profile  Reply with Quote
I think the move opens things up nicely. I'm eager to see the development. How are you going to handle backdrops?

Bob


It's only make-believe

Country: USA | Posts: 5329 Go to Top of Page

Michael Hohn
Fireman



Posted - 12/01/2019 :  3:30:49 PM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
quote:
Originally posted by railman28

I think the move opens things up nicely. I'm eager to see the development. How are you going to handle backdrops?

Bob


Hi Bob!

Thank you for your interest and support. To answer your question, I donít plan at this point having a backdrop on the peninsula. I think it would be a nuisance during operations and would look weird. However, the narrow shelf to the left has a high backdrop which provides a good background when doing photos on the peninsula. I might add a shallow band of scenery along the front of the staging shelf, sloping down from track level, to provide the appearance of uninterrupted landscape in photos.

Mike



Country: USA | Posts: 5571 Go to Top of Page

deemery
Fireman

Premium Member


Posted - 12/01/2019 :  3:47:13 PM  Show Profile  Reply with Quote
You could always tack up a backdrop just for photography.

dave


Modeling 1890s (because the voices in my head told me to)

Country: USA | Posts: 7951 Go to Top of Page

Michael Hohn
Fireman



Posted - 12/01/2019 :  4:22:32 PM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
quote:
Originally posted by deemery

You could always tack up a backdrop just for photography.

dave


Thatís true, Dave. I have a 2í by 4í portable section of Masonite backdrop intended to cover a window which I sometimes use. But I fear that in a clumsy moment I will let it fall on my layout and wipe out structures and rolling stock.

By utilizing the current backdrop I will have a scene about 4í deep with very little effort. And it will be permanent

Mike



Country: USA | Posts: 5571 Go to Top of Page

railman28
Fireman



Posted - 12/02/2019 :  5:15:13 PM  Show Profile  Reply with Quote
Mike, tape up a temporary one about 14" high and see if that makes things look better. it should at least improve pictures.

Bob


It's only make-believe

Country: USA | Posts: 5329 Go to Top of Page

Michael Hohn
Fireman



Posted - 12/02/2019 :  7:06:58 PM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
Bob, Thank you for the suggestion. Iíll probably try something like that before I do anything more permanent. You guys have given me some ideas.

M



Country: USA | Posts: 5571 Go to Top of Page

Bernd
Fireman



Posted - 12/02/2019 :  7:14:42 PM  Show Profile  Visit Bernd's Homepage  Reply with Quote
Mike,

Have ever considered Trackside Scenery from Joey Ricard?

http://www.tracksidescenery.com/index.php?id_category=7&controller=category

Bernd



Country: USA | Posts: 3373 Go to Top of Page

Michael Hohn
Fireman



Posted - 12/02/2019 :  7:47:55 PM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
quote:
Originally posted by Bernd

Mike,

Have ever considered Trackside Scenery from Joey Ricard?

http://www.tracksidescenery.com/index.php?id_category=7&controller=category

Bernd


Thank you, Bernd. Iím familiar with their structure flats but not their backdrops. Iíll take a look.

Iíd forgotten about this company so I appreciate your suggestion.

Mike



Country: USA | Posts: 5571 Go to Top of Page

Michael Hohn
Fireman



Posted - 12/09/2019 :  12:57:15 PM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
Tracklaying has been started on the rural end of my layout. I decided to model the actual town of Alderson, PA, situated on a branch of the Lehigh Valley Railroad and serving a lumbering region and Harvey's Lake, a tourist destination. I have several old photos of the depot and surrounding area as well as freight and passenger trains on the branch. I have already modeled many of the flats, gondolas and boxcars, so I'm all set up regarding freight cars.

Here is a view of the rural end of my layout:



You can see the backdrop--which I will probably have to repaint to represent a hillier topography--the narrow shelf for staging representing points south, and the peninsula which will probably have a lumber industry-related scene. You can see that the backdrop really serves the shelf and peninsula for purposes of photographing scenes. You can also see my bottle of white glue, not used so much these days. Because layout-building is an iterative process for me, I've learned to use water-soluble glue for ballast. A good soaking and I can gently work the track loose and remove ballast when I make changes. The yellow wood glues are very good, but not very water soluble, and track is hard to get up in one piece, especially the Micro Engineering track I use.

I have the track down for the wye, very important for operations:



The track arrangement conforms to a map of LVRR trackage around the Alderson depot, including the wye.

I can push cars along and they run smoothly without derailments, so now I must wire this area. Then I can test it with trains.

Mike



_______________________________________________________________________________________________
Nobody living can ever stop me, as I go walking that freedom highway -- Woody Guthrie

Country: USA | Posts: 5571 Go to Top of Page
Page: of 89 Previous Topic: Promised Update... Topic Next Topic: Max Engine Miles per Hour  
 New Topic |   Reply to Topic | 
Previous Page | Next Page
Jump To:
Railroad Line Forums © 2000-19 Railroad Line Co. Go To Top Of Page
Steam was generated in 0.45 seconds. Powered By: Snitz Forums 2000