| Author |
Topic  |
|
|
Geezer
Fireman
   
Premium Member
 |
Posted - 06/04/2012 : 2:14:12 PM
|
Ok....I installed the PM-42 without much problems in the reading of the directions and the wiring: The issue is, I have completely isolated the 2nd power district, and the test loco's navigate through all 3 districts.Howerer, when the loco is in section 2, and I short section one, the sound will reset and the loco will hesitate for about 2 seconds. With the test loco in section 2, and I short the 3rd district, nothing happens, and the loco proceeds as norman. (no hesitation or sound reset) Gremlins? I would bet a fair amount that the PM-42 is wired correctly, including the ground and connection to the Zeypher command station. Any ideas???
|
Bill
CC&BW Wilani Lumber & Mining Co. http://www.railroad-line.com/forum/topic.asp?TOPIC_ID=34275&whichpage=58 http://www.railroad-line.com/forum/topic.asp?TOPIC_ID=28172&whichpage=89 |
Country: USA
| Posts: 8183 |
|
|
desertdrover
Engineer
    
Premium Member

|
Posted - 06/04/2012 : 4:00:23 PM
|
Sorry, unless I am there to check things out, and see whats going on, it's a tough call to make for you.
|
Louis Pacific Northwest Logging in the East Coast |
|
Country: USA
| Posts: 11265 |
 |
|
|
Tommatthews
Fireman
   
Premium Member

|
Posted - 06/04/2012 : 4:26:09 PM
|
Bill,
Did you check the wiring of the servos? Make sure a section one servo is not getting power from section 2 .. or section 2 servo is not getting power from section 1.
|
|
Country:
| Posts: 7277 |
 |
|
| |
Topic  |
|
|
|
|
|
|
|
| Railroad Line Forums |
© 2000-13 Railroad Line Co. |
 |
|
|