|
Note: You must be registered in order to post a reply. To register, click here. Registration is FREE!
|
| T O P I C R E V I E W |
| Geezer |
Posted - 06/04/2012 : 2:14:12 PM Ok....I installed the PM-42 without much problems in the reading of the directions and the wiring: The issue is, I have completely isolated the 2nd power district, and the test loco's navigate through all 3 districts.Howerer, when the loco is in section 2, and I short section one, the sound will reset and the loco will hesitate for about 2 seconds. With the test loco in section 2, and I short the 3rd district, nothing happens, and the loco proceeds as norman. (no hesitation or sound reset) Gremlins? I would bet a fair amount that the PM-42 is wired correctly, including the ground and connection to the Zeypher command station. Any ideas??? |
| 2 L A T E S T R E P L I E S (Newest First) |
| Tommatthews |
Posted - 06/04/2012 : 4:26:09 PM Bill,
Did you check the wiring of the servos? Make sure a section one servo is not getting power from section 2 .. or section 2 servo is not getting power from section 1. |
| desertdrover |
Posted - 06/04/2012 : 4:00:23 PM Sorry, unless I am there to check things out, and see whats going on, it's a tough call to make for you. |
|
|
|
|
| Railroad Line Forums |
© 2000-13 Railroad Line Co. |
 |
|
|