Railroad Line Forums
Railroad Line Forums
Home | Profile | Register | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

 All Forums
 Model Railroad Forums
 Layout Design / Operation Sig Forum
 Curving Code 70 HOn3 MicroEngineering track????
 New Topic  Reply to Topic
 Printer Friendly
Author Previous Topic Topic Next Topic  

MudHen 462
New Hire

USA
41 Posts

Posted - 06/29/2012 :  11:31:40 PM  Show Profile  Reply with Quote
I did a forum search here but found nothing. Has anyone got any ideas on getting the track to conform to a radius long enough to work with it? I ordered an alignment gauge by RibbonRail but it is only about 4" long and it's taking forever to lay track in this "tight" corner of my layout.


Any advice will be greatly appreciated... Bob

Dutchman
Administrator

USA
23277 Posts

Posted - 06/30/2012 :  08:46:50 AM  Show Profile  Reply with Quote
Bob,

What is your sub-roadbed? When working on plywood, I draw my curve on the wood, and begin bending the track to the curve, placing small wood screws with washers between the ties at necessary intervals to hold it in place.

This photo shows that approach.



When working on cork or foam, I use the trusty T-Pins.



I hope that this helps.

Bruce

Modeling the railroads of the Jersey Highlands in HO and the logging railroads of Pennsylvania in HOn3
Go to Top of Page

Dutchman
Administrator

USA
23277 Posts

Posted - 06/30/2012 :  08:58:25 AM  Show Profile  Reply with Quote
BTW, Bob, have you seen our sub-forum dedicated to HOn30/HOn3 modeling? Here is the link: http://www.railroad-line.com/forum/forum.asp?FORUM_ID=96

Some guys there might have other ideas on curving the track, too.

Finally, welcome to the Forum!

Bruce

Modeling the railroads of the Jersey Highlands in HO and the logging railroads of Pennsylvania in HOn3
Go to Top of Page

MudHen 462
New Hire

USA
41 Posts

Posted - 06/30/2012 :  3:15:15 PM  Show Profile  Reply with Quote
Thanks, Bruce... my subroadbed is foam (Plywood under that... but that's no help) I guess I'll just have to "glue and pin" 4 inches at a time. The area I'm having problems with is in a tight corner and I'm 74 and have Spinal Stenosis... so it's kinda a Catch 22 situation!

I'll get 'er done, anyway... Thanks again.

Mudhen Bob
Go to Top of Page

railmus
Fireman

Canada
1631 Posts

Posted - 06/30/2012 :  4:03:09 PM  Show Profile  Visit railmus's Homepage  Reply with Quote
On cork or even plywood, I like to use thumbtacks as you can test run cars and engines over them to ensure proper operation.
T pins best for foam.

John Kanakos
CNJWS II, Custom Models- Design & Build
http://www.junctionwestsub.ca
NMRA #055691 CARM # 212
Go to Top of Page

dave m
Section Hand

USA
85 Posts

Posted - 06/30/2012 :  6:04:55 PM  Show Profile  Reply with Quote
Bob, is it a longer gauge you are looking for?

http://www.handlaidtrack.com/Fast-Tracks-HOn3-Scale-Curved-SweepSticks-s/2227.htm

Dave M
Go to Top of Page

MudHen 462
New Hire

USA
41 Posts

Posted - 06/30/2012 :  6:32:46 PM  Show Profile  Reply with Quote
Yes, Dave... that would definately help.

Thanks, MudHen Bob
Go to Top of Page
  Previous Topic Topic Next Topic  
 New Topic  Reply to Topic
 Printer Friendly
Jump To:
Railroad Line Forums © 2000-13 Railroad Line Co. Go To Top Of Page
Steam was generated in 0.16 seconds. Snitz Forums 2000