Railroad Line Forums
Railroad Line Forums
Home | Profile | Register | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

 All Forums
 Model Railroad Forums
 Mike Chambers' Craftsman's Corner
 Tortoise Below Mounting - How-to
 New Topic  Reply to Topic
 Printer Friendly
Next Page
Author Previous Topic Topic Next Topic
Page: of 2

desertdrover
Engineer

USA
11263 Posts

Posted - 05/11/2012 :  1:23:53 PM  Show Profile  Reply with Quote
A question on another thread was asked about mounting Tortoise Machines, so I thought I would make this how-to and post it here for all interested members.
My staging yard is a flat area with 1”x4” grid work with ½” plywood and ½”homasote screwed down on top of the grid work (similar to the picture below - Thanks to Mike Mueller). Since it was not possible to see the switches from the underside of the layout, I made a jig to line-up/center, and mount the tortoise machines from below. I had already drilled the switch holes through the homasote and plywood dead center under the center of the throw bar. This is the jig I made to make life easier for me under the layout. I hope this all makes sense to you. I took a Kadee height gauge and drilled out a hole in the middle front for a piano wire the same size as the Tortoise wire. Then epoxied the wire to the Kadee gauge. This way the Kadee Gauge sits on the switch after it is in place on the layout, and centers the switch to the middle/center with the wire going through. Then I got under the layout and used the Tortoise template to slip up onto the wire so I could mark the four (4) holes for the Tortoise Machine. It lined up the tortoise each and every time. This method worked like a charm for me. See pictures for how the modified Kadee was made and used to line up the Tortoise wire.





















Louis
Pacific Northwest Logging in the East Coast

AVRR-PA
Fireman

USA
4600 Posts

Posted - 05/12/2012 :  06:33:06 AM  Show Profile  Visit AVRR-PA's Homepage  Reply with Quote
Thank, Louis! That's really first-class engineering. I'm printing it out for my notebook.

Don
Go to Top of Page

desertdrover
Engineer

USA
11263 Posts

Posted - 05/12/2012 :  08:36:50 AM  Show Profile  Reply with Quote
Thanks Don!

Louis
Pacific Northwest Logging in the East Coast
Go to Top of Page

railmus
Fireman

Canada
1624 Posts

Posted - 05/12/2012 :  08:51:33 AM  Show Profile  Visit railmus's Homepage  Reply with Quote
Am I missing something here?
How do you ensure that the tortoise is not rotated at all?

Great tutorial!
Go to Top of Page

desertdrover
Engineer

USA
11263 Posts

Posted - 05/12/2012 :  3:53:12 PM  Show Profile  Reply with Quote
quote:
Originally posted by railmus

Am I missing something here?
How do you ensure that the tortoise is not rotated at all?

Great tutorial!


Thanks John.
See the arrow in the Tortoise template? Well, that shows the direction of the track above. You can see from the bottom of the layout through the hole the drawbar direction, so the arrow is placed in the direction of the track, and the Tortoise mounting holes are made.
Did I make sense in what I'm saying?
I used a picture of a switch (assume it is up-side-down) and I used a red circle to show what you see from the bottom of the layout up through the hole to know the direction of the track.






Louis
Pacific Northwest Logging in the East Coast

Edited by - desertdrover on 05/12/2012 4:23:53 PM
Go to Top of Page

anubis51
Crew Chief

Australia
932 Posts

Posted - 05/12/2012 :  4:17:45 PM  Show Profile  Reply with Quote
Hi Louis,

That Kadee coupling gauge modification...Great idea!

You keep coming up with all these wonderful gadgets, tools, and critters - it makes me wonder how you have any time left over for anything else....

Thanks for sharing.


John




Time is the Gauge of Existence
Go to Top of Page

desertdrover
Engineer

USA
11263 Posts

Posted - 05/12/2012 :  4:20:00 PM  Show Profile  Reply with Quote
quote:
Originally posted by anubis51

Hi Louis,

That Kadee coupling gauge modification...Great idea!

You keep coming up with all these wonderful gadgets, tools, and critters - it makes me wonder how you have any time left over for anything else....

Thanks for sharing.


John






Thanks much John. [:-thumbu]
This hobby has been a big part of my life from a young age. And, know retirement has a big help on things that just used to be in my head.

Louis
Pacific Northwest Logging in the East Coast
Go to Top of Page

MarkF
Engineer

USA
9272 Posts

Posted - 05/12/2012 :  7:04:11 PM  Show Profile  Visit MarkF's Homepage  Reply with Quote
Louis, that is one clever idea! I'm fortunate that I have SteamNut that seems to love installing those damn things, but I'm certain this would make his job easier too. Great idea and thanks for sharing!

Mark

See my homepage at http://home.comcast.net/~prrndiv/
Go to Top of Page

Orionvp17
Fireman

USA
2806 Posts

Posted - 05/12/2012 :  7:17:49 PM  Show Profile  Reply with Quote
Louis,

What a great idea! I love it!

I, too, wondered about rotation looking up from "down under." Seems to me that you could resolve that pretty easily by measuring down from the track to the bottom of the hole and attaching a small length of wire to the shaft perpendicular to the track to give a good idea of the orientation from below.

A piece about a quarter of an inch or so long epoxied to the shaft would do it. Cut a slit in the template, send the shaft down the hole, slide the template slot over the perpendicular wire and you'd have a positive indication of where the holes should go.

Pete
who can never seem to get "comfortable" under the layout
in Michigan
Go to Top of Page

k9wrangler
Fireman

USA
5887 Posts

Posted - 05/12/2012 :  7:30:32 PM  Show Profile  Reply with Quote
I've gone to using hot glue to attach my Tortoi.. I use a pre-drilled hole in the roadbed below the throwbar, tack the throwbar with the turnout half thrown and then attach the machine with an elongate wire sticking up an inch or so before trimming.

I don't have any SteamNuts around here to help me, and mine hurt climbing under the layout...

Karl Scribner
H.M.F.W.B.I.C.
Kentucky Southern Rwy & Associated Lines
Sunfield Twp. Michigan

Go to Top of Page

Frank Palmer
Crew Chief

USA
561 Posts

Posted - 05/13/2012 :  09:48:08 AM  Show Profile  Visit Frank Palmer's Homepage  Reply with Quote
Switch machines are one thing, but what about that benchwork, it looks like poplar. It's beautiful! That's what I'm in awe of.

Frank
Go to Top of Page

desertdrover
Engineer

USA
11263 Posts

Posted - 05/13/2012 :  12:52:43 PM  Show Profile  Reply with Quote
quote:
Originally posted by Frank Palmer

Switch machines are one thing, but what about that benchwork, it looks like poplar. It's beautiful! That's what I'm in awe of.


Thanks Frank, but the benchwork I can't take credit for, it is a job that Mike Mueller is doing. I just used the framework picture for a reference for the switch machine how-to.

Louis
Pacific Northwest Logging in the East Coast
Go to Top of Page

desertdrover
Engineer

USA
11263 Posts

Posted - 05/13/2012 :  12:53:34 PM  Show Profile  Reply with Quote
quote:
Originally posted by MarkF

Louis, that is one clever idea! I'm fortunate that I have SteamNut that seems to love installing those damn things, but I'm certain this would make his job easier too. Great idea and thanks for sharing!


Thanks for your comments Mark, and taking a look.

Louis
Pacific Northwest Logging in the East Coast
Go to Top of Page

desertdrover
Engineer

USA
11263 Posts

Posted - 05/13/2012 :  12:57:58 PM  Show Profile  Reply with Quote
quote:
Originally posted by Orionvp17

Louis,

What a great idea! I love it!

I, too, wondered about rotation looking up from "down under." Seems to me that you could resolve that pretty easily by measuring down from the track to the bottom of the hole and attaching a small length of wire to the shaft perpendicular to the track to give a good idea of the orientation from below.

A piece about a quarter of an inch or so long epoxied to the shaft would do it. Cut a slit in the template, send the shaft down the hole, slide the template slot over the perpendicular wire and you'd have a positive indication of where the holes should go.

Pete
who can never seem to get "comfortable" under the layout
in Michigan


Thanks Pete. It's pretty straight forward, once you see the drawbar from below, because you know 90 degrees from that is the track. The holes on either side of the Tortoise are straight with the drawbar side to side.

Louis
Pacific Northwest Logging in the East Coast
Go to Top of Page

desertdrover
Engineer

USA
11263 Posts

Posted - 05/13/2012 :  1:02:55 PM  Show Profile  Reply with Quote
quote:
Originally posted by k9wrangler

I've gone to using hot glue to attach my Tortoi.. I use a pre-drilled hole in the roadbed below the throwbar, tack the throwbar with the turnout half thrown and then attach the machine with an elongate wire sticking up an inch or so before trimming.

I don't have any SteamNuts around here to help me, and mine hurt climbing under the layout...



Your method is about the same Karl. By me using the modified Kadee guage, it hooks/sets down onto the track switch, and holds the drawbar centered for marking Tortoise placement.

Louis
Pacific Northwest Logging in the East Coast
Go to Top of Page

closetguy
Fireman

USA
1290 Posts

Posted - 05/14/2012 :  10:46:00 AM  Show Profile  Visit closetguy's Homepage  Reply with Quote
Hi Frank
Yes, the bench work is Poplar.
I buy 4/4 at the lumber wholesaler and than rip it to 3 1/2" wide pieces. I use hardened #8 x 2" phillips screw with a self tap tip and nibbed head to attach everything. The nibbed head is self recessing. The Poplar is cheaper than clear pine, and since Poplar is technically a "hardwood" it is some much stronger than pine. The layout you see is being built for a client and is 10 x 14 .
Mike M
Go to Top of Page
Page: of 2 Previous Topic Topic Next Topic  
Next Page
 New Topic  Reply to Topic
 Printer Friendly
Jump To:
Railroad Line Forums © 2000-13 Railroad Line Co. Go To Top Of Page
Steam was generated in 0.25 seconds. Snitz Forums 2000